Phase 2 – Engine Repair Stage 4: We decided to put the engine back together since the bottom end looks good so that we can test some of the components and the compression of the engine plus we will be able to see if oil is traveling to needed areas. Continued disassembly that found bass …
Monthly Archives: October 2018
October 22, 2018
Phase 2 – Engine Repair Stage 2: Today progress was made on the CC striping the interior parts. Labels and photo were made and parts stored. Gas tank was removed and all the parts are complete, the tank will need to be hot tank because it was full of rust and a new copper fuel hose …
October 1-November 19, 2018
Phase 3 – Remove Upper Decks Stage 1: 10/1/18 Stored all loose parts. Cleaned glass and seats and then stored them. 10/17/18 Decided to leave upper deck to keep everything a bit more solid when we flip the boat. 11/19/18 Removal of interior starts.
October 1, 2018
Phase Two: Engine Repair Stage 1: We removed the valve covers and everything looked good. Even had clean oil in the journals like it had been run not to long ago. We then removed the intake manifold and it did not look as good with ⅛” to ¼” of sludge build up. The good news …